Resultados:
Kebriyaii, O., Hamzehei, M., & Khalilzadeh, M. K. (2021). A disaster relief commodity supply chain network considering emergency relief volunteers: a case study. Journal of Humanitarian Logistics and Supply Chain Management, 11(3), 493-521. https://doi.org/10.1108/JHLSCM-08-2020-0073 [Published: July (3rd Quarter/Summer) 2021]
Banihashemi, S., & Khalilzadeh, M. K. (2022). Time-cost-quality-risk Trade-off Project Scheduling Problem in Oil and Gas Construction Projects: Fuzzy Logic and Genetic Algorithm. Jordan Journal of Civil Engineering, 16(2), 355-364. https://jjce.just.edu.jo/issues/paper.php?p=6091.pdf [Published: 2022]
Soon, A., Heidari, A., Khalilzadeh, M. K., Antucheviciene, J., Kazimieras, E., & Zahedi, F. (2022). Multi-objective sustainable closed-loop supply chain network design considering multiple products with different quality levels. Systems, 10(4). https://doi.org/10.3390/systems10040094 [Accepted: June 2022, Published: July (3rd Quarter/Summer) 2022]
Fozooni, A., Kamari, O., Pourtalebiyan, M., Gorgich, M., Khalilzadeh, M. K., & Valizadeh, A. (2022). An analysis of the operation factors of three PSO-GA-ED meta-heuristic search methods for solving a single-objective optimization problem. Computational Intelligence and Neuroscience. https://doi.org/10.1155/2022/2748215 [Published: October (4th Quarter/Autumn) 2022]
Heidari, A., Imani, D., Khalilzadeh, M. K., & Sarbazvatan, M. (2022). Green two‐echelon closed and open location‐routing problem: application of NSGA‐II and MOGWO metaheuristic approaches. Environment, Development and Sustainability. https://doi.org/10.1007/s10668-022-02429-w [Accepted: May 2022, Published: June 2022]
Banihashemi, S., & Khalilzadeh, M. K. (2022). A robust bi-objective optimization model for resource levelling project scheduling problem with discounted cash flows. KSCE Journal of Civil Engineering, 26, 2539–2554. https://doi.org/10.1007/s12205-022-0679-z [Accepted: January 2022, Published: June 2022]
Banihashemi, S. A., & Khalilzadeh, M. K. (2022). Application of fuzzy BWM-CoCoSo to time–cost–environmental impact trade-off construction project scheduling problem. International Journal of Environmental Science and Technology. https://doi.org/10.1007/s13762-022-04075-1 [Published: April (2nd Quarter/Spring) 2022]
Lashgari, A., Hosseinzadeh, H., Khalilzadeh, M. K., Milani, B., Ahmadisharaf, A., & Rashidi, S. (2022). Transportation energy demand forecasting in Taiwan based on metaheuristic algorithms. Energy Sources Part A-Recovery Utilization and Environmental Effects, 44(2), 2782-2800. https://doi.org/10.1080/15567036.2022.2062072 [Accepted: March 2022, Published: April (2nd Quarter/Spring) 2022]
Ansari, R., Khalilzadeh, M. K., Taherkhani, R., Antucheviciene, J., Migilinskas, D., & Moradi, S. (2022). Performance prediction of construction projects based on the causes of claims: A system dynamics approach. Sustainability, 14(7). https://doi.org/10.3390/su14074138 [Published: March 2022]
Banihashemi, A., & Khalilzadeh, M. K. (2022). Towards sustainable project scheduling with reducing environmental pollution of projects: fuzzy multi-objective programming approach to a case study of Eastern Iran. Environment, Development and Sustainability. https://doi.org/10.1007/s10668-022-02370-y [Accepted: April 2022, Published: May 2022]