Resultados:
Abbasi, F., & Khalilzadeh, M. K. (2021). The model of human resource management strategies for Iranian project-based construction organizations. Jordan Journal of Civil Engineering, 15(2), 266-276. https://jjce.just.edu.jo/issues/show_paper.php?pid=5929 [Published: 2021]
Banihashemi, B., Khalilzadeh, M. K., Antucheviciene, J., & Šaparauskas, J. (2021). Trading off time–cost–quality in construction project scheduling problems with fuzzy SWARA–TOPSIS approach. Buildings, 11(9). https://doi.org/10.3390/buildings11090387 [Published: September 2021]
Banihashemi, S., Khalilzadeh, M. K., Kazimieras Zavadskas, E., & Antucheviciene, J. (2021). Investigating the environmental impacts of construction projects in Time-Cost Trade-Off project scheduling problems with CoCoSo multi-criteria decision-making method. Sustainability, 13(19). https://doi.org/10.3390/su131910922 [Published: October (4th Quarter/Autumn) 2021]
Hedayati, A., Khalilzadeh, M. K., & Bahari, A. (2021). The effect of organisational learning capability on individual performance through the use of enterprise resource planning and user satisfaction. Journal of Information and Knowledge Management. https://doi.org/10.1142/S021964922150026X [Published: April (2nd Quarter/Spring) 2021]
Kebriyaii, O., Heidari, A., Khalilzadeh, M. K., Antucheviciene, J., & Pavlovskis, M. (2021). Application of three metaheuristic algorithms to time-cost-quality trade-off project scheduling problem for construction projects considering time. Symmetry, 13(12). https://doi.org/10.3390/sym13122402 [Accepted: December 2021, Published: December 2021]
Zarjou, M., & Khalilzadeh, M. K. (2021). Optimal project portfolio selection with reinvestment strategy considering sustainability in an uncertain environment: A multi-objective optimization approach. Kybernetes. https://doi.org/10.1108/K-11-2020-0737 [Published: June 2021]
Vardin, A., Ansari, R., Khalilzadeh, M. K., Antucheviciene, J., & Bausys, R. (2021). An integrated decision support model based on BWM and Fuzzy-VIKOR techniques for contractor selection in construction projects. Sustainability, 12(13). https://doi.org/10.3390/su13126933 [Published: June 2021]
Khalilzadeh, M. K. (2021). Resource levelling in projects considering different activity execution modes and splitting. Journal of Engineering, Design and Technology. https://doi.org/10.1108/JEDT-11-2020-0463 [Published: May 2021]
Rezaei, F., Khalilzadeh, M. K., & Soleimani, P. (2021). Factors affecting knowledge management and its effect on organizational performance: mediating the role of human capital. Advances in Human-Computer Interaction. https://doi.org/10.1155/2021/8857572 [Published: February 2021]
Khalilzadeh, M. K., Kebriyaii, O., & Rezaei, R. (2021). Identification and selection of stakeholder engagement strategies: case study of an Iranian oil and gas construction project. International Journal of Construction Management. https://doi.org/10.1080/15623599.2021.1889749 [Published: March 2021]
Khalilzadeh, M. K., Ghasemi, P., Afrasiabi, A., & Shakeri, H. (2021). Hybrid fuzzy MCDM and FMEA integrating with linear programming approach for the health and safety executive risks: a case study. Journal of Modelling in Management. https://doi.org/10.1108/JM2-12-2019-0285 [Published: March 2021]
Khalilzadeh, M. K., Kebriyaii, O., Šaparauskas, J., & Lepkova, N. (2021). Towards an efficient approach for identification and selection of stakeholder engagement strategies: A case study. E & M Ekonomie a Management, 24(4), 56–71. https://doi.org/10.15240/tul/001/2021-4-004 [Published: 2021]